ALLOTTED PLOTS |
S.No |
Plot Details |
ALLOTMENT NUMBER |
NAME OF THE INDUSTRY |
DATE OF ALLOTMENT |
STATUS OF ALLOTMENT |
CANCELLATION STATUS |
NO. OF PLOTS ALLOTTED |
CATEGORY OF ALLOTMENT |
POSSESSION DATE |
DUE DATE FOR IMPLEMENTATION (INCLUDING EOT) |
Site Plan |
Plot Number |
Plot Type |
Extent |
SQM |
ACRE |
1 |
10 |
PLOT |
51.0 |
0.01 |
64332 |
BALAJI TYRES |
01-Mar-2023 |
Final Allotment |
NA |
1 |
General |
null |
2025-03-02 |
|
2 |
100 |
PLOT |
51.0 |
0.01 |
64327 |
BHAVANI SREEJA AUTO ELECTRICAL WORKS |
01-Mar-2023 |
Sale Agreement(Lease Deed) |
NA |
1 |
General |
2024-02-17 |
2025-03-02 |
|
3 |
101 |
PLOT |
51.0 |
0.01 |
65094 |
NIKHIL MECHANICAL WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
ST |
null |
2025-11-19 |
|
4 |
102 |
PLOT |
51.0 |
0.01 |
64325 |
GIRI ARC WELDING WORKS |
01-Mar-2023 |
Land Cost Paid |
NA |
1 |
SC |
null |
2025-03-02 |
|
5 |
103 |
PLOT |
51.0 |
0.01 |
64643 |
MALLI MECHANICAL WORKS |
23-Jun-2023 |
Final Allotment |
NA |
1 |
SC |
null |
2025-06-22 |
|
6 |
104 |
PLOT |
51.0 |
0.01 |
65086 |
DEVID SPARES |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-11-19 |
|
7 |
105 |
PLOT |
51.0 |
0.01 |
63295 |
VIJAYA DURGA ENGINEERING WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-01-18 |
|
8 |
106 |
PLOT |
51.0 |
0.01 |
64121 |
TULASI BATTERY WORKS |
27-Dec-2022 |
Provisional Allotment |
NA |
1 |
General |
null |
2024-12-26 |
|
9 |
107 |
PLOT |
51.0 |
0.01 |
63269 |
DIVYA BATTERY WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-01-18 |
|
10 |
108 |
PLOT |
51.0 |
0.01 |
65304 |
SRI SYAMALAMBA TRACTOR SPARES |
22-Dec-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-12-26 |
|
11 |
11 |
PLOT |
51.0 |
0.01 |
65507 |
VENKATESWARA TRADERS |
22-Feb-2024 |
Provisional Allotment |
NA |
1 |
NA |
null |
2026-02-21 |
|
12 |
110 |
PLOT |
51.0 |
0.01 |
63265 |
BISMILLAH AUTO ELECTRICAL WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
13 |
111 |
PLOT |
51.0 |
0.01 |
64644 |
SRI LAKSHMI ARUNA ENGINE REBOARING WORKS |
23-Jun-2023 |
Final Allotment |
NA |
1 |
General |
null |
2025-06-22 |
|
14 |
114 |
PLOT |
51.0 |
0.01 |
63393 |
SRINIVASA AUTOMOBILES AND ELECTRICALS |
07-Feb-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-02-06 |
|
15 |
115 |
PLOT |
51.0 |
0.01 |
63591 |
DASU MECHANICAL WORKS |
29-Mar-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-03-28 |
|
16 |
116 |
PLOT |
51.0 |
0.01 |
64337 |
SANKAR BATTERY WORKS |
01-Mar-2023 |
Final Allotment |
NA |
1 |
General |
null |
2025-03-02 |
|
17 |
117 |
PLOT |
51.0 |
0.01 |
64333 |
SVS SPRAY PAINTING WORKS |
01-Mar-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-03-02 |
|
18 |
118 |
PLOT |
51.0 |
0.01 |
65008 |
GOWRI SHANKAR AUTOMOBILES |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-11-19 |
|
19 |
119 |
PLOT |
51.0 |
0.01 |
64636 |
SAI MOTOR CYCLE WORKS |
23-Jun-2023 |
Final Allotment |
NA |
1 |
BC |
null |
2025-06-22 |
|
20 |
120 |
PLOT |
51.0 |
0.01 |
64122 |
SRI DURGA ELECTRICAL WORKS |
27-Dec-2022 |
Provisional Allotment |
NA |
1 |
General |
null |
2024-12-26 |
|
21 |
121 |
PLOT |
51.0 |
0.01 |
64334 |
BASHA MECHANICAL WORKS |
01-Mar-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-03-02 |
|
22 |
122 |
PLOT |
51.0 |
0.01 |
64335 |
KGN BODY BUILDERS |
01-Mar-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-03-02 |
|
23 |
123 |
PLOT |
51.0 |
0.01 |
63493 |
SAI DURGA MECHANICAL WORKS |
15-Mar-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-03-14 |
|
24 |
124 |
PLOT |
51.0 |
0.01 |
63491 |
KOTESWARAMMA MECHANICAL WORKS |
15-Mar-2022 |
Sale Agreement(Lease Deed) |
NA |
1 |
General |
2024-02-17 |
2026-03-14 |
|
25 |
125 |
PLOT |
51.0 |
0.01 |
63270 |
FAYAZ MECHANICAL WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
26 |
128 |
PLOT |
51.0 |
0.01 |
63262 |
MOIEN MECHANICAL WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
27 |
129 |
PLOT |
51.0 |
0.01 |
63311 |
JYOTHI ELECTRICAL WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
SC |
null |
2026-01-18 |
|
28 |
130 |
PLOT |
51.0 |
0.01 |
65544 |
LAKSHMI COMMAN KATTALU WORKS |
22-Feb-2024 |
Provisional Allotment |
NA |
1 |
null |
null |
2026-02-21 |
|
29 |
131 |
PLOT |
51.0 |
0.01 |
63387 |
GIRISHWAR MECHANICAL WORKS |
07-Feb-2022 |
Final Allotment |
NA |
1 |
SC |
null |
2026-02-06 |
|
30 |
132 |
PLOT |
51.0 |
0.01 |
65550 |
LAKSHMAIAH ELECTRICAL WORKS |
22-Feb-2024 |
Provisional Allotment |
NA |
1 |
NA |
null |
2026-02-21 |
|
31 |
133 |
PLOT |
51.0 |
0.01 |
63327 |
SRI MANIKANTA ELECTRICAL WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
32 |
134 |
PLOT |
51.0 |
0.01 |
63313 |
RAHEEM ENGINEERING WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
33 |
135 |
PLOT |
51.0 |
0.01 |
63275 |
KALA WOOD TURNING CENTER |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-01-18 |
|
34 |
136 |
PLOT |
51.0 |
0.01 |
63388 |
VIJAYA DURGA ELECTRICAL WORKS |
07-Feb-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-02-06 |
|
35 |
138 |
PLOT |
51.0 |
0.01 |
64314 |
SANKARARAO KOLLIMI WORKS |
01-Mar-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-03-02 |
|
36 |
139 |
PLOT |
51.0 |
0.01 |
64444 |
KARTHEEK WELDING WORKS |
01-Mar-2023 |
Land Cost Paid |
NA |
1 |
SC |
null |
2025-03-02 |
|
37 |
140 |
PLOT |
51.0 |
0.01 |
65001 |
VARA PRASAD SEAT WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-11-19 |
|
38 |
141 |
PLOT |
51.0 |
0.01 |
63274 |
BISHMILLAH WATER SERVICING |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
39 |
142 |
PLOT |
51.0 |
0.01 |
65170 |
TAJ TYRE WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-11-19 |
|
40 |
143 |
PLOT |
51.0 |
0.01 |
63264 |
SHABBIR WELDING WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
41 |
144 |
PLOT |
51.0 |
0.01 |
63251 |
LAKSHMI WELDING WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
42 |
145 |
PLOT |
51.0 |
0.01 |
65540 |
RAZA ENGINEERING WORKS |
22-Feb-2024 |
Provisional Allotment |
NA |
1 |
null |
null |
2026-02-21 |
|
43 |
146 |
PLOT |
51.0 |
0.01 |
63291 |
SAYYAD ALI FOUNDARY WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
44 |
148 |
PLOT |
51.0 |
0.01 |
63586 |
REHAMAN AUTO ELECTRICAL WORKS |
29-Mar-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-03-28 |
|
45 |
149 |
PLOT |
51.0 |
0.01 |
63684 |
BISMILLAH OLD TYRE WORKS |
31-Mar-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-03-30 |
|
46 |
15 |
PLOT |
51.0 |
0.01 |
64331 |
RAVI OILS |
01-Mar-2023 |
Final Allotment |
NA |
1 |
General |
null |
2025-03-02 |
|
47 |
150 |
PLOT |
51.0 |
0.01 |
64341 |
MANIKANTA PAINTING WORKS |
01-Mar-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-03-02 |
|
48 |
151 |
PLOT |
51.0 |
0.01 |
64124 |
JABEER MECHANICAL WORKS |
27-Dec-2022 |
Final Allotment |
NA |
1 |
BC |
null |
2024-12-26 |
|
49 |
152 |
PLOT |
51.0 |
0.01 |
64395 |
RAMESH ENGINEERING WORKS |
01-Mar-2023 |
Final Allotment |
NA |
1 |
BC |
null |
2025-03-02 |
|
50 |
153 |
PLOT |
51.0 |
0.01 |
64324 |
ARSHAD SEAT AND BAG WORKS |
01-Mar-2023 |
Final Allotment |
NA |
1 |
BC |
null |
2025-03-02 |
|
51 |
154 |
PLOT |
51.0 |
0.01 |
64391 |
SRI VENKATESWARA MECHANICAL WORKS |
01-Mar-2023 |
Final Allotment |
NA |
1 |
General |
null |
2025-03-02 |
|
52 |
155 |
PLOT |
51.0 |
0.01 |
65055 |
SANKAR MECHANICAL WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-11-19 |
|
53 |
156 |
PLOT |
51.0 |
0.01 |
65201 |
RAMBABU WELDING WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-11-19 |
|
54 |
158 |
PLOT |
51.0 |
0.01 |
63585 |
RAHAMANIA RADIATOR WORKS |
29-Mar-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-03-28 |
|
55 |
159 |
PLOT |
51.0 |
0.01 |
63305 |
VENKATESWARA ELECTRONICS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
56 |
16 |
PLOT |
51.0 |
0.01 |
63597 |
INDIAN AUTOMOBILES |
29-Mar-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-03-28 |
|
57 |
160 |
PLOT |
51.0 |
0.01 |
63294 |
MD IQBAL SEAT WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
58 |
161 |
PLOT |
51.0 |
0.01 |
63297 |
JALA DURGA DC ELECTRICAL WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
59 |
164 |
PLOT |
51.0 |
0.01 |
65172 |
RAJYALAKSHMI WELDING WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-11-19 |
|
60 |
165 |
PLOT |
51.0 |
0.01 |
63280 |
SWAMY AYYAPPA WELDING WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
SC |
null |
2026-01-18 |
|
61 |
166 |
PLOT |
51.0 |
0.01 |
63288 |
MUKTHESWARA RAO WELDING WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
SC |
null |
2026-01-18 |
|
62 |
167 |
PLOT |
51.0 |
0.01 |
63308 |
IRMIYA FOUNDARY WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
SC |
null |
2026-01-18 |
|
63 |
169 |
PLOT |
51.0 |
0.01 |
63382 |
SURESH BODY BUILDING WORKS |
07-Feb-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-02-06 |
|
64 |
17 |
PLOT |
51.0 |
0.01 |
63255 |
JAYA SAI PAINTS AND GENERAL STORES |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-01-18 |
|
65 |
170 |
PLOT |
51.0 |
0.01 |
64207 |
TAHA MADINA MECHANICAL WORKS |
27-Dec-2022 |
Provisional Allotment |
NA |
1 |
BC |
null |
2024-12-26 |
|
66 |
173 |
PLOT |
51.0 |
0.01 |
65299 |
SRINU FOUNDARY |
22-Dec-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-12-26 |
|
67 |
174 |
PLOT |
51.0 |
0.01 |
65173 |
SREE METAL LASER CUTTING WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-11-19 |
|
68 |
175 |
PLOT |
51.0 |
0.01 |
63312 |
KOTESWARARAO KOLIMI WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
SC |
null |
2026-01-18 |
|
69 |
177 |
PLOT |
51.0 |
0.01 |
63277 |
SRI LASKHMI GANAPATI BEARING WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-01-18 |
|
70 |
180 |
PLOT |
51.0 |
0.01 |
63273 |
KISAN ENGINEERING WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
71 |
181 |
PLOT |
51.0 |
0.01 |
63302 |
NATIONAL ENGINEERING WORKS |
19-Jan-2022 |
Provisional Allotment |
NA |
1 |
BC |
null |
2026-01-18 |
|
72 |
182 |
PLOT |
51.0 |
0.01 |
63492 |
VENKATAREDDY ENGINEERING WORKS |
15-Mar-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-03-14 |
|
73 |
184 |
PLOT |
51.0 |
0.01 |
65054 |
VEERENDRA MECHANICAL WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-11-19 |
|
74 |
185 |
PLOT |
51.0 |
0.01 |
63298 |
ANJI TRACTOR MECHANICAL WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
75 |
186 |
PLOT |
51.0 |
0.01 |
64315 |
FATHIMA KOLLIMI WORKS |
01-Mar-2023 |
Final Allotment |
NA |
1 |
BC |
null |
2025-03-02 |
|
76 |
187 |
PLOT |
51.0 |
0.01 |
64321 |
RISHITHA WELDING WORKS |
01-Mar-2023 |
Land Cost Paid |
NA |
1 |
BC |
null |
2025-03-02 |
|
77 |
188 |
PLOT |
51.0 |
0.01 |
64403 |
MUSTAFA FOUNDARY WORKS |
01-Mar-2023 |
Final Allotment |
NA |
1 |
BC |
null |
2025-03-02 |
|
78 |
189 |
PLOT |
51.0 |
0.01 |
64669 |
RIDA AUTOMOBILES |
23-Jun-2023 |
Final Allotment |
NA |
1 |
BC |
null |
2025-06-22 |
|
79 |
19 |
PLOT |
56.0 |
0.01 |
63296 |
SRI GOPI KRISHNA AUTO AGENCIES |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-01-18 |
|
80 |
190 |
PLOT |
51.0 |
0.01 |
65508 |
JAI HANUMAN VEHICLE PAINTS |
22-Feb-2024 |
Provisional Allotment |
NA |
1 |
NA |
null |
2026-02-21 |
|
81 |
191 |
PLOT |
51.0 |
0.01 |
65098 |
BISMILLAH WELDING SHOP |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-11-19 |
|
82 |
192 |
PLOT |
51.0 |
0.01 |
65165 |
BALU OLD TYRE WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-11-19 |
|
83 |
193 |
PLOT |
51.0 |
0.01 |
64357 |
SEETAMAHALAKSHMI ELECTRICAL WORKS |
01-Mar-2023 |
Land Cost Paid |
NA |
1 |
General |
null |
2025-03-02 |
|
84 |
194 |
PLOT |
51.0 |
0.01 |
64318 |
KHADAR BEG FOUNDARY WORKS |
01-Mar-2023 |
Final Allotment |
NA |
1 |
BC |
null |
2025-03-02 |
|
85 |
195 |
PLOT |
51.0 |
0.01 |
64123 |
SAMBASIVA OLD SCRAP SHOP |
27-Dec-2022 |
Provisional Allotment |
NA |
1 |
General |
null |
2024-12-26 |
|
86 |
197 |
PLOT |
51.0 |
0.01 |
64323 |
BISMILLAH WELDING WORKS |
01-Mar-2023 |
Final Allotment |
NA |
1 |
BC |
null |
2025-03-02 |
|
87 |
20 |
PLOT |
51.0 |
0.01 |
65096 |
NATIONAL SPARE PARTS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-11-19 |
|
88 |
200 |
PLOT |
51.0 |
0.01 |
65575 |
SHAHIDA EV SERVICE |
22-Feb-2024 |
Provisional Allotment |
NA |
1 |
null |
null |
2026-02-21 |
|
89 |
201 |
PLOT |
51.0 |
0.01 |
65195 |
ESWARI ENGINEERING WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-11-19 |
|
90 |
202 |
PLOT |
51.0 |
0.01 |
65283 |
SRINU ENGINEERING WORSK |
22-Dec-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-12-26 |
|
91 |
203 |
PLOT |
51.0 |
0.01 |
65292 |
SRI SUJANTH ENGINEERING |
22-Dec-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-12-26 |
|
92 |
204 |
PLOT |
51.0 |
0.01 |
64202 |
SUDHEER WELDING WORKS |
27-Dec-2022 |
Provisional Allotment |
NA |
1 |
SC |
null |
2024-12-26 |
|
93 |
205 |
PLOT |
51.0 |
0.01 |
64697 |
KALYANA VENKATESWARA MECHANICAL WORKS |
23-Jun-2023 |
Final Allotment |
NA |
1 |
General |
null |
2025-06-22 |
|
94 |
206 |
PLOT |
51.0 |
0.01 |
65853 |
SRI LAKSHMI PRASANNA INVERTER AND BATTERY WORKS |
15-Mar-2024 |
Provisional Allotment |
NA |
1 |
ST,Others |
null |
2026-03-14 |
|
95 |
207 |
PLOT |
51.0 |
0.01 |
64992 |
TANVEER MECHANICAL WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-11-19 |
|
96 |
208 |
PLOT |
51.0 |
0.01 |
65203 |
AKTHAR RAZA DISPOSAL SHOP |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-11-19 |
|
97 |
209 |
PLOT |
51.0 |
0.01 |
65199 |
LATEEF SEAT WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-11-19 |
|
98 |
210 |
PLOT |
51.0 |
0.01 |
63589 |
SAI RAM LORRY KAMAN KATTALU WORKS |
29-Mar-2022 |
Provisional Allotment |
NA |
1 |
BC |
null |
2026-03-28 |
|
99 |
211 |
PLOT |
51.0 |
0.01 |
65922 |
ESWAR ELECTRICAL WORKS |
15-Mar-2024 |
Provisional Allotment |
NA |
1 |
ST,Others |
null |
2026-03-14 |
|
100 |
213 |
PLOT |
51.0 |
0.01 |
65532 |
VENKATESWARA MECHANICAL WORKS |
22-Feb-2024 |
Provisional Allotment |
NA |
1 |
null |
null |
2026-02-21 |
|
101 |
214 |
PLOT |
51.0 |
0.01 |
63304 |
VENKATESWARA MECHANICAL WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
SC |
null |
2026-01-18 |
|
102 |
215 |
PLOT |
51.0 |
0.01 |
63279 |
SIVAJI ENGINEERING WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
SC |
null |
2026-01-18 |
|
103 |
216 |
PLOT |
51.0 |
0.01 |
63250 |
RAJAN MECHANICAL WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
SC |
null |
2026-01-18 |
|
104 |
217 |
PLOT |
66.0 |
0.02 |
63247 |
BAJI TRACTOR AND LORRY MECHANICAL WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
105 |
218 |
PLOT |
66.0 |
0.02 |
63249 |
PASHA AUTO SERVICES |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
106 |
219 |
PLOT |
66.0 |
0.02 |
65163 |
SIVA TRACTOR MECHANICAL WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-11-19 |
|
107 |
22 |
PLOT |
51.0 |
0.01 |
64397 |
TANVIVARMA CARPENTER WORKS |
01-Mar-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-03-02 |
|
108 |
222 |
PLOT |
66.0 |
0.02 |
65064 |
YESU TRACTOR MECHANICAL WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-11-19 |
|
109 |
223 |
PLOT |
66.0 |
0.02 |
64717 |
BISMILLAH MECHANICAL WORKS |
23-Jun-2023 |
Final Allotment |
NA |
1 |
BC |
null |
2025-06-22 |
|
110 |
227 |
PLOT |
66.0 |
0.02 |
66001 |
U PVC GLASS AND HARDWARE |
15-Mar-2024 |
Provisional Allotment |
NA |
1 |
SC,Others |
null |
2026-03-15 |
|
111 |
229 |
PLOT |
66.0 |
0.02 |
65058 |
SHANMUKHA CAR MECHANICAL WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-11-19 |
|
112 |
23 |
PLOT |
51.0 |
0.01 |
64209 |
SRI RAGHAVAIAH AUTOMOBILES |
27-Dec-2022 |
Final Allotment |
NA |
1 |
General |
null |
2024-12-26 |
|
113 |
230 |
PLOT |
66.0 |
0.02 |
65179 |
BAIRAGI TRACTOR MECHANICAL WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-11-19 |
|
114 |
231 |
PLOT |
66.0 |
0.02 |
63395 |
BHAGYALAKSHMI TRACTOR MECHANICAL WORKS |
07-Feb-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-02-06 |
|
115 |
233 |
PLOT |
66.0 |
0.02 |
64680 |
SYAM MECHANICAL WORKS |
23-Jun-2023 |
Final Allotment |
NA |
1 |
SC |
null |
2025-06-22 |
|
116 |
235 |
PLOT |
92.0 |
0.02 |
64393 |
RAJYALAKSHMI TRACTOR MECHANICAL WORKS |
01-Mar-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-03-02 |
|
117 |
236 |
PLOT |
66.0 |
0.02 |
63259 |
CHANDU MECHANICAL WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
SC |
null |
2026-01-18 |
|
118 |
239 |
PLOT |
66.0 |
0.02 |
64204 |
SAMBASIVARAO MECHANICAL WORKS |
27-Dec-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2024-12-26 |
|
119 |
24 |
PLOT |
51.0 |
0.01 |
63261 |
BHARAT AUTOMOBILES |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
120 |
241 |
PLOT |
66.0 |
0.02 |
64399 |
SRI JALADESWARA TRACTOR MECHANICAL WORKS |
01-Mar-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-03-02 |
|
121 |
244 |
PLOT |
66.0 |
0.02 |
64627 |
SRI RAJYA LAKSHMI TRACTOR MECHANICAL WORKS |
23-Jun-2023 |
Land Cost Paid |
NA |
1 |
General |
null |
2025-06-22 |
|
122 |
246 |
PLOT |
66.0 |
0.02 |
65202 |
SRINIVASA LORRY MECHANICAL WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-11-19 |
|
123 |
247 |
PLOT |
66.0 |
0.02 |
63272 |
DURGA SYAM MECHANICAL WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-01-18 |
|
124 |
248 |
PLOT |
66.0 |
0.02 |
64404 |
SRINU TRACTOR MECHANICAL WORKS |
01-Mar-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-03-02 |
|
125 |
249 |
PLOT |
66.0 |
0.02 |
64714 |
MESSAIAH TRACTOR MECHANICAL WORKS |
23-Jun-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-06-22 |
|
126 |
25 |
PLOT |
51.0 |
0.01 |
65994 |
BHARAT ENTERPRISES |
15-Mar-2024 |
Provisional Allotment |
NA |
1 |
Minority,Others |
null |
2026-03-15 |
|
127 |
250 |
PLOT |
66.0 |
0.02 |
65999 |
SAIBABU TRACTOR MECHANICAL WORKS |
15-Mar-2024 |
Provisional Allotment |
NA |
1 |
General,Others |
null |
2026-03-15 |
|
128 |
252 |
PLOT |
66.0 |
0.02 |
65493 |
NIKHIL WORKSHOP |
22-Feb-2024 |
Provisional Allotment |
NA |
1 |
NA |
null |
2026-02-21 |
|
129 |
28 |
PLOT |
51.0 |
0.01 |
65286 |
JMJ ENTERPRISES |
22-Dec-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-12-26 |
|
130 |
29 |
PLOT |
51.0 |
0.01 |
64119 |
SURESH MECHANICAL WORKS |
27-Dec-2022 |
Land Cost Paid |
NA |
1 |
SC |
null |
2024-12-26 |
|
131 |
34 |
PLOT |
51.0 |
0.01 |
63248 |
SREE NIRMALA AUTOMOTIVES |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
132 |
35 |
PLOT |
51.0 |
0.01 |
64706 |
NATIONAL ELECTRONICS |
23-Jun-2023 |
Final Allotment |
NA |
1 |
BC |
null |
2025-06-22 |
|
133 |
36 |
PLOT |
51.0 |
0.01 |
63244 |
NAVODAYA TRACTOR SPARES |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
134 |
37 |
PLOT |
51.0 |
0.01 |
63246 |
VIJAYA DURGA AUTOMOBILES |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-01-18 |
|
135 |
38 |
PLOT |
51.0 |
0.01 |
65095 |
AFSHAL WORKSHOP |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-11-19 |
|
136 |
39 |
PLOT |
51.0 |
0.01 |
63593 |
RADHAKRISHNA BATTERY WORKS |
29-Mar-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-03-28 |
|
137 |
40 |
PLOT |
51.0 |
0.01 |
65085 |
UDAYA BHASKAR AUTOMOBILES |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-11-19 |
|
138 |
41 |
PLOT |
51.0 |
0.01 |
65204 |
CHANUKYA COMPUTER SALES AND SERVICING |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-11-19 |
|
139 |
42 |
PLOT |
51.0 |
0.01 |
65200 |
ARUNA AUTOMOBILES |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-11-19 |
|
140 |
44 |
PLOT |
51.0 |
0.01 |
66002 |
PADMA LIGHTINGS |
15-Mar-2024 |
Provisional Allotment |
NA |
1 |
General,Others |
null |
2026-03-15 |
|
141 |
45 |
PLOT |
51.0 |
0.01 |
65004 |
RENU SEAT WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-11-19 |
|
142 |
46 |
PLOT |
51.0 |
0.01 |
65944 |
MASTAN MECHANICAL WORKS |
15-Mar-2024 |
Provisional Allotment |
NA |
1 |
Minority,Others |
null |
2026-03-15 |
|
143 |
47 |
PLOT |
51.0 |
0.01 |
65970 |
RAVI WELDING WORSK |
15-Mar-2024 |
Provisional Allotment |
NA |
1 |
BC,Others |
null |
2026-03-15 |
|
144 |
49 |
PLOT |
51.0 |
0.01 |
65484 |
RAMA LAKSHMANA ELECTRICAL WORKS |
22-Feb-2024 |
Provisional Allotment |
NA |
1 |
NA |
null |
2026-02-21 |
|
145 |
50 |
PLOT |
51.0 |
0.01 |
64210 |
SRI HANUMA TYRE VULCANIZATION WORKS |
27-Dec-2022 |
Provisional Allotment |
NA |
1 |
General |
null |
2024-12-26 |
|
146 |
51 |
PLOT |
51.0 |
0.01 |
65025 |
LAKSHMI ELECTRICAL WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-11-19 |
|
147 |
52 |
PLOT |
51.0 |
0.01 |
63293 |
SEETHARAMAIAH ELECTRICAL WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
Women,General |
null |
2026-01-18 |
|
148 |
53 |
PLOT |
51.0 |
0.01 |
63267 |
ARUNA ENGINEERING COMPANY |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-01-18 |
|
149 |
54 |
PLOT |
58.0 |
0.01 |
63268 |
SPANDANA ENGINEERING COMPANY |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-01-18 |
|
150 |
55 |
PLOT |
59.0 |
0.01 |
65026 |
SRI SAINATH ENTERPRISES |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-11-19 |
|
151 |
56 |
PLOT |
51.0 |
0.01 |
65044 |
SAI VAMSI HOME NEEDS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-11-19 |
|
152 |
57 |
PLOT |
51.0 |
0.01 |
63252 |
BABU PAINTING WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
153 |
6 |
PLOT |
51.0 |
0.01 |
64392 |
LEELA KRISHNA LUBRICANTS |
01-Mar-2023 |
Final Allotment |
NA |
1 |
General |
null |
2025-03-02 |
|
154 |
61 |
PLOT |
51.0 |
0.01 |
65291 |
Chaitanya Mechanical Works |
22-Dec-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-12-26 |
|
155 |
62 |
PLOT |
51.0 |
0.01 |
65504 |
NAGABABU WORKSHOP |
22-Feb-2024 |
Provisional Allotment |
NA |
1 |
NA |
null |
2026-02-21 |
|
156 |
63 |
PLOT |
51.0 |
0.01 |
64704 |
SRIKRISHNA ELECTRICAL WORKS |
23-Jun-2023 |
Provisional Allotment |
NA |
1 |
ST |
null |
2025-06-22 |
|
157 |
64 |
PLOT |
51.0 |
0.01 |
65198 |
GUDIVADA VIDYA SAGAR |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-11-19 |
|
158 |
65 |
PLOT |
51.0 |
0.01 |
65097 |
SHYAM WELDING WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-11-19 |
|
159 |
66 |
PLOT |
51.0 |
0.01 |
65557 |
BABU ENGINEERING WORKS |
22-Feb-2024 |
Provisional Allotment |
NA |
1 |
NA |
null |
2026-02-21 |
|
160 |
67 |
PLOT |
51.0 |
0.01 |
63384 |
NAGESWARA MECHANICAL WORKS |
07-Feb-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-02-06 |
|
161 |
68 |
PLOT |
51.0 |
0.01 |
63317 |
CHANDRA AUTOMOBILES |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-01-18 |
|
162 |
69 |
PLOT |
51.0 |
0.01 |
63314 |
VARA LAKSHMI MOTORS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-01-18 |
|
163 |
7 |
PLOT |
51.0 |
0.01 |
65193 |
LEELA KRISHNA TYRES AND TUBES |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-11-19 |
|
164 |
70 |
PLOT |
51.0 |
0.01 |
63287 |
Bismillah Work Shop |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
165 |
71 |
PLOT |
51.0 |
0.01 |
63299 |
K V K RAO ELECTRICAL WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-01-18 |
|
166 |
72 |
PLOT |
51.0 |
0.01 |
63242 |
SRI LAKSHMI AUTOMOBILES |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-01-18 |
|
167 |
74 |
PLOT |
51.0 |
0.01 |
63284 |
VENKATA RAMANA ELECTRICAL AC AND DC WORKS |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
168 |
75 |
PLOT |
51.0 |
0.01 |
63320 |
VASANTARAO AUTO CONSULTANCY |
19-Jan-2022 |
Sale Agreement(Lease Deed) |
NA |
1 |
General |
2024-02-20 |
2026-01-18 |
|
169 |
76 |
PLOT |
51.0 |
0.01 |
63498 |
VIGNESWARA VULCANIZATION WORKS |
15-Mar-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-03-14 |
|
170 |
78 |
PLOT |
51.0 |
0.01 |
63698 |
GUTHIKONDA SUBRAHMANYAM |
31-Mar-2022 |
Land Cost Paid |
NA |
1 |
General |
null |
2026-03-30 |
|
171 |
79 |
PLOT |
51.0 |
0.01 |
64208 |
LAKSHMI AUTOSTORES |
27-Dec-2022 |
Final Allotment |
NA |
1 |
General |
null |
2024-12-26 |
|
172 |
8 |
PLOT |
51.0 |
0.01 |
64396 |
LEELA KRISHNA AUTOMOBILES |
01-Mar-2023 |
Final Allotment |
NA |
1 |
BC |
null |
2025-03-02 |
|
173 |
80 |
PLOT |
51.0 |
0.01 |
64316 |
YASIN OLD SCRAP MERCHANTS |
01-Mar-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-03-02 |
|
174 |
81 |
PLOT |
51.0 |
0.01 |
64663 |
MEHER PAINTS AND IRON |
23-Jun-2023 |
Final Allotment |
NA |
1 |
General |
null |
2025-06-22 |
|
175 |
82 |
PLOT |
51.0 |
0.01 |
64635 |
KHUDDUS PAINTING WORKS |
23-Jun-2023 |
Final Allotment |
NA |
1 |
BC |
null |
2025-06-22 |
|
176 |
83 |
PLOT |
51.0 |
0.01 |
64390 |
VASU ELECTRICAL WORKS |
01-Mar-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-03-02 |
|
177 |
84 |
PLOT |
51.0 |
0.01 |
64206 |
SHABUL MOTORS |
27-Dec-2022 |
Final Allotment |
NA |
1 |
BC |
null |
2024-12-26 |
|
178 |
86 |
PLOT |
51.0 |
0.01 |
63598 |
KAZA AUTO ELECTRICAL WORKS |
29-Mar-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-03-28 |
|
179 |
87 |
PLOT |
51.0 |
0.01 |
63596 |
KAZA BATTERY AND ELECTRICAL WORKS |
29-Mar-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-03-28 |
|
180 |
88 |
PLOT |
51.0 |
0.01 |
63323 |
SATYAM AUTOMOBILES |
19-Jan-2022 |
Land Cost Paid |
NA |
1 |
BC |
null |
2026-01-18 |
|
181 |
89 |
PLOT |
51.0 |
0.01 |
63322 |
VIGNESWARA LORRY SUPLLY OFFICE |
19-Jan-2022 |
Final Allotment |
NA |
1 |
General |
null |
2026-01-18 |
|
182 |
9 |
PLOT |
51.0 |
0.01 |
65196 |
V R AUTO ELECTRICALS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
General |
null |
2025-11-19 |
|
183 |
91 |
PLOT |
61.0 |
0.02 |
65917 |
SUNNY MECHANICAL WORK |
15-Mar-2024 |
Provisional Allotment |
NA |
1 |
SC,Others |
null |
2026-03-14 |
|
184 |
93 |
PLOT |
51.0 |
0.01 |
65986 |
SRI VENKATESWARA MECHANICAL WORKS |
15-Mar-2024 |
Provisional Allotment |
NA |
1 |
General,Others |
null |
2026-03-15 |
|
185 |
94 |
PLOT |
51.0 |
0.01 |
65089 |
KOTAIAH MECHANICAL WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-11-19 |
|
186 |
95 |
PLOT |
51.0 |
0.01 |
64662 |
SURESH MECHANICAL WORKS |
23-Jun-2023 |
Final Allotment |
NA |
1 |
SC |
null |
2025-06-22 |
|
187 |
96 |
PLOT |
51.0 |
0.01 |
65366 |
SWAPNA WELDING WORKS |
22-Dec-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-12-26 |
|
188 |
97 |
PLOT |
51.0 |
0.01 |
65197 |
RAVI WELDING WORKS |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-11-19 |
|
189 |
MSME-1 |
PLOT |
300.0 |
0.07 |
61502 |
TEJA FABRICATIONS |
17-Feb-2020 |
Provisional Allotment |
Cancelled |
1 |
SC |
null |
2025-03-31 |
|
190 |
MSME-10 |
PLOT |
300.0 |
0.07 |
61495 |
ANAGHA TECHSOL |
17-Feb-2020 |
Sale Agreement(Lease Deed) |
Notice Issued |
1 |
BC |
2021-08-09 |
2021-02-16 |
|
191 |
MSME-11 |
PLOT |
300.0 |
0.07 |
61495 |
ANAGHA TECHSOL |
17-Feb-2020 |
Sale Agreement(Lease Deed) |
Notice Issued |
1 |
BC |
2021-08-09 |
2021-02-16 |
|
192 |
MSME-12 |
PLOT |
300.0 |
0.07 |
64313 |
SRI SAI NADHA WELDING WORKS |
01-Mar-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-03-02 |
|
193 |
MSME-13 |
PLOT |
540.0 |
0.13 |
64317 |
TULASI RADHA TRADERS |
01-Mar-2023 |
Provisional Allotment |
NA |
1 |
BC |
null |
2025-03-02 |
|
194 |
MSME-2 |
PLOT |
300.0 |
0.07 |
65084 |
Kishore Engineering Works |
20-Nov-2023 |
Provisional Allotment |
NA |
1 |
SC |
null |
2025-11-19 |
|
195 |
MSME-3 |
PLOT |
300.0 |
0.07 |
58406 |
SEAL TECH ENGINEERS & FABRICATORS |
08-Feb-2019 |
Sale Agreement(Lease Deed) |
Notice Issued |
1 |
SC |
2019-11-07 |
2020-09-08 |
|
196 |
MSME-4 |
PLOT |
300.0 |
0.07 |
61497 |
JONNADULA CHAITANYA |
17-Feb-2020 |
Final Allotment |
NA |
1 |
BC |
null |
2021-02-16 |
|
197 |
MSME-5 |
PLOT |
300.0 |
0.07 |
61496 |
GOPAL TRADING |
17-Feb-2020 |
Sale Agreement(Lease Deed) |
Notice Issued |
1 |
SC |
2021-08-04 |
2021-02-16 |
|
198 |
MSME-6 |
PLOT |
300.0 |
0.07 |
58455 |
VIJAY ENGINEERING WORKS |
08-Feb-2019 |
Sale Agreement(Lease Deed) |
Notice Issued |
1 |
SC |
2019-11-07 |
2020-07-08 |
|
199 |
MSME-7 |
PLOT |
300.0 |
0.07 |
61491 |
SHIVA ENGINERING WORKS |
17-Feb-2020 |
Sale Agreement(Lease Deed) |
NA |
1 |
SC |
2024-02-17 |
2025-03-31 |
|
200 |
MSME-8 |
PLOT |
300.0 |
0.07 |
61499 |
ADISESHU PEARLS AND GOLD COVERING JEWELERS |
17-Feb-2020 |
Sale Agreement(Lease Deed) |
NA |
1 |
BC |
2023-06-19 |
2025-06-18 |
|
201 |
MSME-9 |
PLOT |
300.0 |
0.07 |
61492 |
JONNADULA SATISH |
17-Feb-2020 |
Sale Agreement(Lease Deed) |
NA |
1 |
BC |
2023-06-19 |
2025-06-18 |
|
202 |
TOTAL |
|
14099.0 |
3.07 |
|
|
|
|
|
|
|
|
|
|